Rongcheng Wind Farm is located in the eastern part of Shandong Province. The farm was constructed in three phases and has a combined capacity of 147.8MW(Phase I: 48.8MW ; Phases II and III: 2 x 49.5MW) . It is a joint venture between CLP and a subsidiary of the China Shenhua Energy Group.
Rongcheng III comprises of 33 x 1.5MW units wind turbines from Goldwind, was commissioned in 2011.